Control Earth Reticulation
Part No – LLT-CER-EARTH
Part No – LLT-CER-EARTH
How does the unit work?
Control Earth Kit Retic. RED (1-33KV)
2 x 2m Phase leads of 40mm2 flexible copper red insulation c/w snap on clamps both sides.
1 x 12m Phase to ground lead of 40mm2 flexible copper red insulation c/w snap on clamp one side and earth clamp other side.
1 x Cluster head
1 x Red carry bag
Installation of CER
1. Attached earth clamp of long lead to earth spike.
2. Take snap on clamp of long lead and attache to applicator head on link stick.
3. Apply snap on clamp to middle phase.
4. Take one phase lead and apply snap on clamps to applicator head.
5. Apply phase lead from centre phase to left outer phase.
6. Repeat process with other phase lead but move from centre phase to right outer phase.
7. Removal is the exact reverse of application.
LLT-CER-EARTH
Tel : +2718 468 5080
Mobile: +2784 701 3354
Email : sales@liveline.co.za
Browse our extensive range of high voltage products.