Control Earth Substation
Part No – LLT-CES EARTH
Part No – LLT-CES EARTH
How does the unit work?
Control Earth Kit Substation (10-20KA)
CES20.4 or CES20.6
3 x 4m Phase leads of 95mm2 flexible copper red insulation c/w screw on clamp one side and earth clamp for earth ball on the other side
1 x Operating head
1 x Red carry bag
Kits are available with 4m & 6m length leads
Installation of CES
CES20.4 or CES20.6
1. Attached earth clamp of each lead to earth ball in substation.
2. Attache operating head to link stick.
3. Insert spindle of screw on phase clamp into operating head, hook over conductor and tighten clamp by rotating the link stick..
4. Repeat step 3 with the remaining two leads.
5. Removal is the exact reverse of application
Part No – LLT-CES EARTH
Tel : +2718 468 5080
Mobile: +2784 701 3354
Email : sales@liveline.co.za
Transformer Combi Unit
Live Line Arrester
Indoor Surge Arresters
Distribution Class Arresters
High Voltage Surge Arresters
Browse our extensive range of high voltage products.